Tender Estimate Bays
Bid submission
A tender estimate bay is the first desk a project visits. We take the issued drawing set and the specification, measure the quantities that matter to a computer integrated systems package, and build a priced document that can be submitted with confidence. Measurements are taken from the drawing and cross-checked against the schedule rather than copied from a covering brief, because a schedule and a drawing disagree more often than a design team expects. Where the documents leave a boundary undefined, the bay sets the boundary on the face of the sheet and states the assumption in a plain sentence, so the client can see exactly what has been priced and what has been left out.
Pricing follows a three-position rule: where the market permits, each package line is tested against three independent supplier positions, and the basis for the chosen position is written beside the number. Risk allowances are shown separately from the base estimate, never folded in silently, so a client can ask what is held back and why. Before the bid leaves the desk, a named reviewer reads the whole sheet from cover to cover and signs it. That signature is the promise of the practice: if it is on the sheet, it has been checked.
- Quantity take-off from the issued drawing set and the schedule of works.
- Three supplier positions per line where the market allows a round.
- Risk allowances shown apart from the base price.
- Single named reviewer sign-off before submission.